Maldon Building Services Case Study
Council Car Park Resurfacing
Recently completed, White Horse Lane Car Park, adjacent to the High St. in Maldon. Completed and handed over a full week ahead of schedule.
Maldon Building Services Case Study
Recently completed, White Horse Lane Car Park, adjacent to the High St. in Maldon. Completed and handed over a full week ahead of schedule.
Full internal and external refurbishment recently completed for the Salvation Army at their Southend Citadel site with works including; roofing repairs, window replacements, upgrade to five offices, kitchen, lobby and seven bathrooms plus rewire [...]
Successful completion of resurfacing the service road at the Promenade in Maldon, for Maldon District Council.
MBS were appointed by the Mid and South Essex NHS Foundation Trust to carry out enabling works for a modular building at Basildon Hospital. Providing environmental services/supplies including power supplies, BMS, alarms, medical gases, [...]
The works at Barclays Bank, located on Maldon High Street, involved a comprehensive strip-out aimed at preparing the premises for a new occupant. This process was essential to ensure that the space met modern [...]
Comprising of a full internal refurbishment and design plus design and installation of a new coffee bar. Works included upgrades to all washroom facilities, design and installation of lighting and complete decoration throughout with [...]
MBS were delighted to be awarded the contract to demolish the Laundry and Payroll buildings at Basildon Hospital. The process included removal of a large quantity of asbestos, this was monitored through daily air [...]
An exciting project well underway at Broomfield Hospital, numerous projects over various zones including new brick skin facade, triple glazed bespoke window replacement, new helical pile ground beams, air conditioning and curtain walling. [...]
We are well underway with a fantastic project at Basildon Hospital working alongside Hamilton Architects LLP and in partnership with the NHS Trust. Giving the façade of the hospital a rejuvenation by replacing the existing windows [...]
The project comprised the construction of a single storey office complex. The timber framed build was constructed on dwarf walls built on a reinforced clad piled raft. The build incorporated Trapezoid insulated roof panels [...]
We refurbished Colchester School NEECA after their kitchen unfortunately suffered extensive fire damage. All works were completed during a three week period over the school holidays before the school re-opened. You can see from the [...]
Construction of a 2 storey rear extension to form large kitchen diner and bedroom above with en-suite and Juliet balcony. Construction built of reclaimed bricks and all hardwood joinery. 3 bay oak framed cart lodge [...]